Floyd Central High School Project Overview

General Comments
The appearance of the main entrance will be changing during Spring Break.  There will be signs up directing visitors how to enter the building.

New 2-story Classroom Addition
The temporary fence has been installed.  The existing structure, where the new addition will be placed, has been removed.  We are presently removing the concrete slab, in order, to start preparing for the building pad, the installation of the foundations, and the installation of the underground plumbing and electrical.

New Art Rooms Addition
The temporary fence has been installed around this area as well.  The site demolition has started by removing some obstructions around the existing building.  The demolition inside the existing building is nearly complete.  The existing building demolition will start in the near future.  The main entrance, between these two additions, will be relocated to the South for the removal of the existing canopy during Spring Break.

North End of the Upper Level in the Auxiliary Gymnasium
The walls have been erected along with the new door and window frames.  The mechanical, electrical, and fire protection rough-ins have started.  Drywall is being installed.  This area will become the new wrestling room.

Main Gym Locker Rooms / Basement (Existing ROTC location) / New Hallway
The ROTC has been relocated to a temporary classroom.  Demolition has started in these areas.

Construction Dates Currently Under Construction:

New 2-story Classroom Addition January 14, 2008 to March 20, 2009
New Art Rooms Addition     March 3, 2008 to August 1, 2008
Main Gym Locker Rooms/Basement (existing ROTC location)/New Hallway March 4, 2008 to October 10, 2008
Mechanical/Electrical February 18, 2008 to January 1, 2009

FCHS blog
Temporary fencing at new 2-story addition area

FCHS blog
Existing structure removed at new 2-story addition area

FCHS blog
Interior demolition nearly  complete at new art rooms addition

FCHS blog
Existing structure to be removed at the new art room addition

Click here for printable version.
Email thisEmail | PermalinkPermalink | digg this! share on facebook Stumble Upon Del.icio.us
Archive
Floyd Central High School RSS Subscribe
Add 'Floyd Central High School' to iGoogle
Add 'Floyd Central High School' to My AOL
Add 'Floyd Central High School' to My Yahoo!

7240 Georgetown Road, Indianapolis, IN 46268 / Phone: (317) 297-7054 / Fax: (317) 298-7045
© 2008 Verkler Incorporated | All Rights Reserved | Website Content Management by Marketpath CMS